Package CC2 involves the construction of approximately 14.5km of bridges over the waters of Brunei Bay which includes two cable stay bridges (under Package CC3) over the Brunei Channel and Eastern Channel and pre-stressed concrete box girder viaducts for the remaining section together with connecting ramps (under Package CC3) to Jalan Kota Batu, provisions for future connection to Pulau Berambang, and turnaround facility near Pulau Baru Baru with provision for future connections to Pulau Pepatan.
Package CC3 involves the construction of navigation bridges across the Brunei Channel and Eastern Channel that comprises of two cable stayed bridges composed of Brunei Channel Bridge (290m long) and Eastern Channel Bridge (520m long), Connecting Bridges (320m long) between the Brunei Channel Bridge and Mentiri Tunnel, 2 ramps connected to Jalan Kota Batu, administration building, substation near Jalan Kota Batu and some Mechanical & Electrical works.
Package CC4 involves the construction of land viaducts with a total length of 11.8km, embankments and river crossing bridges, a turnaround facility, linking to the Package CC2 marine viaducts to Jalan Labu, Temburong at the other end. The viaducts consist primarily of piled slab structures and constructed in a top-down construction method.
Package CC5B consist route wide design, procurement, supply, construction, installation, testing, commissioning of power supply system & equipment (High Voltatge), power distribution system (Low Voltage), road lighting and traffic signals.
Package CC2 – Marine Viaduct |
|
Client | Ministry of Development Brunei Darussalam |
Duration | 57 Months |
Date of Commencement | 25th February 2015 |
Date of Completion | 26th November 2019 |
Package CC3 – Navigational Bridges |
|
Client | Ministry of Development Brunei Darussalam |
Duration | 50 Months |
Date of Commencement | 1th October 2015 |
Date of Completion | 30th November 2019 |
Package CC4 – Temburong Viaduct |
|
Client | Ministry of Development Brunei Darussalam |
Duration | 50 Months |
Date of Commencement | 1th October 2015 |
Date of Completion | 29th November 2019 |
Package CC5B – Power Supply System, Road Lighting and Traffic Signal |
|
Client | Ministry of Development Brunei Darussalam |
Duration | 24 Months |
Date of Commencement | 29th November 2017 |
Date of Completion | 30th November 2019 |
Our Works